4/9/12 - Looking south at the north rest pier. |
4/12/12 - View of center pier with fender being reconstructed. |
4/13/12 - View of concrete pump getting ready to place the swing span deck. |
4/20/12 - Concrete deck being installed for the south approach. |
4/23/12 - First two girders for the north approach pre-assembled. |
4/23/12 - First two girders for the north approach in place. |
4/26/12 - Last piece of structural steel being installed. |
4/27/12 - Girders in place for the north approach. |
4/27/12 - Diver preparing to enter the water prior to the installation of the submarine cable. |
4/27/12 - Submarine cables being placed into the water. |
4/27/12 - Protective mat for the protection of the submarine cables. |
4/27/12 - Protective mat for submarine cables being lowered in place. |
4/28/12 - Temporary trestle for the north approach being removed. |